Do Lightning Rods Need To Be Removed For A New Roof?

Some roofing projects require components to be temporarily removed or repositioned. The correct approach depends on the roof system, attachment method, conductor routing and scope of work. Coordination before demolition helps protect the roofing crew and prevents accidental cuts or missing parts.

Recommended Reroof Process

  1. Document the existing system with photos and a roof plan.
  2. Identify air terminals, conductors, bonds, penetrations and down conductors affected by the roofing scope.
  3. Coordinate temporary removal or protection of components.
  4. Reinstall compatible attachments and reconnect the system after roofing.
  5. Inspect the completed routing, connections, bonding and grounding.

Common Problems After Roofing

Buildings We Help Coordinate

Homes, churches, schools, apartment buildings, hotels, warehouses, commercial roofs and industrial facilities can all require lightning protection coordination during reroofing or renovation.

Planning A Roof Replacement?

Contact us before roofing begins when possible. Send the address, roof type, photos and project schedule.